1. Product Introduction
This equipment is designed to perform aging tests on the entire gas water heater. The specific test items are as follows
2. Technical Parameters
1. Water pressure test: 0.05MPa~0.50MPa;
2. Gas pressure test: 0.5kPa~5kPa;
3. The water circuit on/off time is adjustable from 0~999 seconds;
4. The number of tests can be preset between 0~999999 times.
3. Main Functions
1. Design and testing workstations: 6;
2. Equipped with compressed air outlet and a blowing device to facilitate drying the water stored in the water heater after testing;
3. Equipped with gas system pressure and water pressure testing functions;
4. The water heater hook can move up and down, left and right;
5. Attractive and elegant appearance, tight and reasonable structure, and various components and measuring instruments are easy to disassemble and install;
6. Water pressure and gas pressure testing use pointer-type instruments for convenient and intuitive operation;
7. Control devices for water and gas circuit systems, solenoid valves, pressure stabilizing valves, etc., use imported advanced products, featuring simple structure, compact size, fast response, easy control, and good stability;
8. Test count includes power-off memory function;
9. Material is 304# stainless steel.
Frequently Asked Questions
What industries is your company's testing equipment mainly suitable for?
We specialize in non-standard testing equipment for gas appliances and household appliances, especially in the gas appliance industry, with nearly thirty years of technical accumulation in the gas appliance industry, including gas water heaters, wall-hung boilers, and gas stoves. At the same time, the equipment is widely used in kitchen appliances such as range hoods, electric ovens, and sterilizers, as well as in environmental reliability testing fields like salt spray tests and high and low temperature tests. In addition, industrial automation inspection solutions can be customized according to customer requirements.
Do you make standard equipment or non-standard customization?
Focusing mainly on non-standard customs. Each production line and every product category has unique testing requirements. We provide a full range of customized services from solution design, mechanical manufacturing, electrical control, to software integration based on your inspection targets (such as valve bodies, complete machines), inspection items (performance, aging, lifespan), production line cycles, and environmental conditions. There are already numerous successful non-standard cases in the gas appliance and home appliance industries for reference.
How is the precision and stability of the equipment? How to verify it?
Before leaving the factory, we conduct complete machine testing and precision calibration according to national or industry specifications, and can provide actual measurement data reports. Common verification methods include: repeated testing with standard samples, comparison with customers' existing qualified equipment, or testing by third-party metrology agencies. For key parameters such as gas flow, pressure, and temperature, we also provide calibration recommendations and cycle reminders. For projects requiring extremely high precision, free sample testing can be arranged.
How long does it take to customize a device? Will it affect my production?
The project duration depends on the complexity of the equipment, generally 4~8 weeks, and includes requirements confirmation, solution design, manufacturing, factory pre-commissioning, and on-site installation. We complete pre-assembly and functional testing of the entire machine in the factory, and only a short time of wiring and fine-tuning can be done on site for trial operation. We will communicate with you in advance about the production shutdown window and develop a detailed installation schedule to minimize the impact on production.
Is the equipment complex to operate? What training do you offer?
The equipment uses a touchscreen human-machine interface, with simple operation logic; ordinary workers can use it daily after half a day of training. We offer tiered training: operator training (power on/off, data retrieval, fixture change), technician training (parameter adjustment, simple fault handling), and engineer training (system configuration, deep maintenance). It also provides a library of operation videos and illustrated manuals for easy access at any time.