Main technical parameters of the simulated transport vibration test bench:
Speed: adjustable at 50~330rpm
Amplitude (displacement): 25.4 mmP-P
Load: 1T
Programmable digital timer: 0.1 seconds ~ 99.59 hours
Worktable dimensions: (L×W×H) 2090×1600×1615mm
Fence height: 1000mm
Movement method: reciprocating (rotary type)
Power consumption: 5.33HP
Power supply: 380V/220V 50Hz
Weight: 1200kg
Precautions for Simulated Transport Vibration Test Bench:
(1) Equipment inspection
1. Check the position of the vibration isolation mechanism; Keep the magnets on the vibration table in a reasonable position;
2. Check whether the controller signal excitation output line is reliably connected;
3. If conducting a horizontal test, flip the stand to a horizontal position according to the equipment instructions and perform corresponding inspections;
(2) Simulated transport vibration test bench regarding specimen installation
1. Turn on the air pump and manually adjust the air pressure in the center bag to the center position;
2. Fixtures and specimens must be installed strictly according to the requirements of the test task book;
3. The installation of the transmission room sensor must strictly follow the requirements of the test task book and be used for designated purposes;
4. Connect the sensor to the controller channel specified in the test task book using the corresponding signal cable;
(3) Simulated Transport Vibration Test Bench Startup Sequence
1. Turn on the system power, confirm the gain switch is in the reset position, and close the amplifier leakage circuit breaker;
2. Set test parameters correctly according to the test task requirements and save them. If test data is called, check whether the test settings match the test task book;
3. Press the power button to start the fan. Turn on the gain knob to the appropriate position (refer to the user manual) / At this point, the "Ready," "Start," and "Power" lights will turn on, and the system will enter the standby state.
4. Run tests, record specimen status and equipment status in real time, and save corresponding test data
Frequently Asked Questions
What industries is your company's testing equipment mainly suitable for?
We specialize in non-standard testing equipment for gas appliances and household appliances, especially in the gas appliance industry, with nearly thirty years of technical accumulation in the gas appliance industry, including gas water heaters, wall-hung boilers, and gas stoves. At the same time, the equipment is widely used in kitchen appliances such as range hoods, electric ovens, and sterilizers, as well as in environmental reliability testing fields like salt spray tests and high and low temperature tests. In addition, industrial automation inspection solutions can be customized according to customer requirements.
Do you make standard equipment or non-standard customization?
Focusing mainly on non-standard customs. Each production line and every product category has unique testing requirements. We provide a full range of customized services from solution design, mechanical manufacturing, electrical control, to software integration based on your inspection targets (such as valve bodies, complete machines), inspection items (performance, aging, lifespan), production line cycles, and environmental conditions. There are already numerous successful non-standard cases in the gas appliance and home appliance industries for reference.
How is the precision and stability of the equipment? How to verify it?
Before leaving the factory, we conduct complete machine testing and precision calibration according to national or industry specifications, and can provide actual measurement data reports. Common verification methods include: repeated testing with standard samples, comparison with customers' existing qualified equipment, or testing by third-party metrology agencies. For key parameters such as gas flow, pressure, and temperature, we also provide calibration recommendations and cycle reminders. For projects requiring extremely high precision, free sample testing can be arranged.
How long does it take to customize a device? Will it affect my production?
The project duration depends on the complexity of the equipment, generally 4~8 weeks, and includes requirements confirmation, solution design, manufacturing, factory pre-commissioning, and on-site installation. We complete pre-assembly and functional testing of the entire machine in the factory, and only a short time of wiring and fine-tuning can be done on site for trial operation. We will communicate with you in advance about the production shutdown window and develop a detailed installation schedule to minimize the impact on production.
Is the equipment complex to operate? What training do you offer?
The equipment uses a touchscreen human-machine interface, with simple operation logic; ordinary workers can use it daily after half a day of training. We offer tiered training: operator training (power on/off, data retrieval, fixture change), technician training (parameter adjustment, simple fault handling), and engineer training (system configuration, deep maintenance). It also provides a library of operation videos and illustrated manuals for easy access at any time.